The Capital Latency Trap
Commercial construction enterprises are suffering from catastrophic capital latency driven by manual lien waiver collection. Subcontractors face an average 51-day wait for payment filled with intense administrative friction: chasing signatures, reconciling conditional waivers, and manually matching documents to banking ledgers. This fragmented architecture paralyzes GC cash flow and exposes the enterprise to clouded property titles, frozen lender drawdowns, and unrecoverable operational drag.